{"id":30699,"date":"2023-08-16T14:50:56","date_gmt":"2023-08-16T13:50:56","guid":{"rendered":"https:\/\/eph23.atelierzidlicky.eu\/?post_type=press-releases&#038;p=30699"},"modified":"2023-08-16T15:17:44","modified_gmt":"2023-08-16T14:17:44","slug":"leag-announces-operation-of-leipheim-gas-fired-power-plant","status":"publish","type":"press-releases","link":"https:\/\/eph23.atelierzidlicky.eu\/en\/press-releases\/leag-announces-operation-of-leipheim-gas-fired-power-plant\/","title":{"rendered":"LEAG Announces Commissioning of&nbsp;Leipheim Gas-fired Power Plant"},"content":{"rendered":"<p>Energy Transition Gains Momentum with Network Stabilization Projects\u00a0<\/p>\n<p><span data-contrast=\"auto\">In order to ensure energy supply reliability, LEAG, co-owned by EPH through its&nbsp;subsidiary EP Power Europe, has commissioned its&nbsp;first gas-fired power plant in&nbsp;Southern Germany near Ulm. The&nbsp;300&nbsp;MW Leipheim gas-fired power plant will play a&nbsp;crucial role in&nbsp;securing Germany&#8217;s&nbsp;energy transition.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">\u201cWe are proud that the&nbsp;construction of&nbsp;the&nbsp;gas-fired power plant in&nbsp;Leipheim and&nbsp;the&nbsp;associated grid connection was completed on schedule and&nbsp;in&nbsp;record time for such a&nbsp;project. It was a&nbsp;major challenge for the&nbsp;entire team and&nbsp;we are now pleased to be a&nbsp;crucial part of&nbsp;the&nbsp;security of&nbsp;supply infrastructure in&nbsp;Bavaria,\u201d<\/span><\/i> said <b><span data-contrast=\"auto\">Jan \u0160pringl, CEO and&nbsp;Vice-chairman of&nbsp;the&nbsp;Board of&nbsp;Directors of&nbsp;EP Power Europe<\/span><\/b><span data-contrast=\"auto\">.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">At the&nbsp;inauguration, Bavaria&#8217;s&nbsp;Prime Minister, Dr. Markus S\u00f6der, emphasized the&nbsp;importance of&nbsp;gas power plants for supply security and&nbsp;network stability.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">As regards the&nbsp;operation of&nbsp;the&nbsp;Leipheim power plant, the&nbsp;facility will be used exclusively at the&nbsp;request of&nbsp;the&nbsp;grid operator, Amprion, which commissioned it to ensure network stability during the&nbsp;shutdown of&nbsp;nuclear power plants and&nbsp;the&nbsp;parallel coal phase-out. The&nbsp;Leipheim power station was established as a&nbsp;special technical network asset within the&nbsp;Amprion network area, as defined in&nbsp;the&nbsp;Energy Industry Act.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<figure><a href=\"https:\/\/eph23.atelierzidlicky.eu\/wp-content\/uploads\/gkl_leipheim_ibn_4.png\"><img decoding=\"async\" class=\"alignnone\" src=\"https:\/\/eph23.atelierzidlicky.eu\/wp-content\/uploads\/gkl_leipheim_ibn_4-300x200.png\" \/><\/a> <a href=\"https:\/\/eph23.atelierzidlicky.eu\/wp-content\/uploads\/gkl_leipheim_ibn_2.png\"><img decoding=\"async\" class=\"alignnone\" src=\"https:\/\/eph23.atelierzidlicky.eu\/wp-content\/uploads\/gkl_leipheim_ibn_2-300x200.png\" \/><\/a><\/figure>\n<p><em>Source: LEAG<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Energy Transition Gains Momentum with Network Stabilization Projects\u00a0 In&nbsp;order to ensure energy supply reliability, LEAG, co-owned by EPH through its&nbsp;subsidiary EP Power Europe, has commissioned its&nbsp;first gas-fired power plant in&nbsp;Southern Germany near Ulm. The&nbsp;300&nbsp;MW Leipheim gas-fired power plant will play a&nbsp;crucial role in&nbsp;securing Germany&#8217;s&nbsp;energy transition.\u00a0 \u201cWe are proud that the&nbsp;construction of&nbsp;the&nbsp;gas-fired power plant in&nbsp;Leipheim [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"_expiration-date-status":"","_expiration-date":0,"_expiration-date-type":"","_expiration-date-categories":[],"_expiration-date-options":[]},"tax-year":[100],"acf":[],"wpml_current_locale":"en_US","wpml_translations":[],"_links":{"self":[{"href":"https:\/\/eph23.atelierzidlicky.eu\/en\/wp-json\/wp\/v2\/press-releases\/30699"}],"collection":[{"href":"https:\/\/eph23.atelierzidlicky.eu\/en\/wp-json\/wp\/v2\/press-releases"}],"about":[{"href":"https:\/\/eph23.atelierzidlicky.eu\/en\/wp-json\/wp\/v2\/types\/press-releases"}],"wp:attachment":[{"href":"https:\/\/eph23.atelierzidlicky.eu\/en\/wp-json\/wp\/v2\/media?parent=30699"}],"wp:term":[{"taxonomy":"tax-year","embeddable":true,"href":"https:\/\/eph23.atelierzidlicky.eu\/en\/wp-json\/wp\/v2\/tax-year?post=30699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}